Download the meter list dlms2mbus_meterlist.csv under the Administration tab.

Edit the file in Notepad or Excel and replace the meter number on the old meter with the new one.

If you want to list the meter in Overview, a meter change must also be done there
Then upload the edited file in the DLMS2MBUS programme.
Normally it takes up to 30 minutes for the meter to be read and saved in the programme memory for access by other systems/programmes.

Comment on this FAQ
Want to join the discussion?Feel free to contribute!